{"id":711,"date":"2023-08-07T17:15:40","date_gmt":"2023-08-07T15:15:40","guid":{"rendered":"https:\/\/redesign.edelstahlwerk-ossenberg.de\/?p=711"},"modified":"2023-08-07T17:15:41","modified_gmt":"2023-08-07T15:15:41","slug":"december-2021-the-first-of-2-forging-presses-has-started-trial-operation","status":"publish","type":"post","link":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/dezember-2021-die-erste-von-2-schmiedepressen-hat-den-probebetrieb-aufgenommen\/","title":{"rendered":"December 2021: The first of 2 forging presses has started trial operation!"},"content":{"rendered":"<p class=\"wp-block-paragraph\">At the beginning of December, one of our two newly purchased forging presses began trial operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A new forging hall was built on the factory premises specifically for the two forging units and was sensibly integrated into the material flow.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Now it is important to integrate the press into the material handling processes, train the employees and adapt the processes to the new possibilities.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"400\" data-id=\"712\" src=\"https:\/\/redesign.edelstahlwerk-ossenberg.de\/wp-content\/uploads\/RTEmagicC_IMG_0051_04.JPG.jpg\" alt=\"\" class=\"wp-image-712\"\/><\/figure>\n<\/figure>","protected":false},"excerpt":{"rendered":"<p>At the beginning of December, one of our two newly purchased forging presses began trial operation. A new forging hall was specially built on the factory premises for the two forging units and sensibly integrated into the material flow. Now it is a matter of integrating the press into the material handling processes, qualifying the employees and adapting the processes to the new possibilities.<\/p>","protected":false},"author":1,"featured_media":712,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-711","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/posts\/711","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/comments?post=711"}],"version-history":[{"count":0,"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/posts\/711\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/media\/712"}],"wp:attachment":[{"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/media?parent=711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/categories?post=711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edelstahlwerk-ossenberg.de\/en\/wp-json\/wp\/v2\/tags?post=711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}